The ship was already at the shipyard, where access has been created in the hull of the ship on both sides of the ship. This is due to the limited space on board.
After disassembly and inspection, a number of parts appeared to be in poor condition. Boone subsequently replaced these parts and repaired them where possible. Using the correct original spare parts and tools.
This job was completed in 2 weeks. After the overhaul and installation on board, the ship was successfully delivered.